Solar Calculator Tripura 2026

Size a rooftop system for your Tripura home under TSECL net metering and the PM Surya Ghar subsidy.

Free · No email · No installer spam

1 Your electricity

Enter your 6-digit PIN to auto-fill your district's average daily generation from NASA satellite data. You can always edit it below.

₹/unit

Indian residential tariffs typically run ₹6–₹9 per unit and rise every year. Check a recent bill for your exact slab rate.

2 Cost & generation

₹/kW

A complete on-grid setup (panels, inverter, structure, wiring, installation) runs about ₹50,000–₹60,000 per kW in 2026. Tier-1 brands (Tata, Adani, Waaree) cost a little more.

units/kW/day

Most of India gets about 4 units (kWh) per kW per day on average; sunnier states (Rajasthan, Gujarat) can reach 4.5–5.

3 Subsidy & state top-up

Central subsidy: ₹30,000/kW up to 2 kW, +₹18,000 for the 3rd kW, capped at ₹78,000 for any system 3 kW and above (residential, up to 10 kW). As of May 2026 (per MNRE). Always confirm current rates at pmsuryaghar.gov.in before applying.

₹/kW

Some states add their own subsidy on top of the central one (e.g. Gujarat has offered ₹10,000/kW). Enter your state's per-kW top-up if any — leave 0 if unsure. Verify with your DISCOM.

4 How you'll pay

Your free-electricity date
— kW system · — panels
System cost (before subsidy)
PM Surya Ghar subsidy
State top-up
Net cost to you
Annual bill savings
Payback period
25-year savings
— units/day Subsidy ₹—

Indicative estimates only. Subsidy rules and tariffs change by government notification and vary by state/DISCOM. Assumes a gradual annual tariff rise and panel degradation. Confirm current PM Surya Ghar rates and get installer quotes before purchasing.

Cumulative savings over 25 years
Starts negative (your net cost), crosses zero on your free-electricity date, then climbs into profit.
How PM Surya Ghar subsidy is calculated
Central subsidy slabs (residential, as of May 2026):
• Up to 2 kW: ₹30,000 per kW (1 kW = ₹30,000; 2 kW = ₹60,000)
• 3rd kW: +₹18,000 (so 3 kW = ₹78,000)
• 3 kW and above: capped at ₹78,000 (no extra above 3 kW; residential eligibility up to 10 kW)

Net cost = system cost − central subsidy − state top-up. Annual savings = annual units generated × tariff (capped at your usage). Payback = net cost ÷ annual savings; the free-electricity date is today plus the payback period. Source: Ministry of New & Renewable Energy / pmsuryaghar.gov.in — verify current values before applying.

Rooftop solar in Tripura: TSECL, net metering and PM Surya Ghar

Power across Tripura is supplied by the Tripura State Electricity Corporation Limited (TSECL), the state DISCOM. TSECL runs the metering, connections and rooftop-solar applications, and it has been active in the PM Surya Ghar programme, with the utility already disbursing subsidy to hundreds of households that turned into small power producers.

Net metering and the 2025 tariff

Under net metering the units your panels export are set off against the units you import, and you pay only the net. A revised tariff took effect from late 2025 with only minor changes; domestic slabs run from about 5.25 rupees per unit for the first 50 units up to roughly 7.75 rupees for heavy use, with a small fixed charge and 5 percent duty. We use a representative figure near 6.5 rupees per unit. Because these rates are far higher than in the low-tariff territories, bill savings in Tripura are meaningful and payback tends to be quicker.

Sunshine in the North-East

Tripura has a warm, humid climate with a strong summer monsoon, so generation dips during the wet months. Over a full year the sun is reasonable but not extreme. We use a yield of about 4.2 units per kW per day as an annual average, which already accounts for cloudy spells. Judge the system on the year, not on a clear day. Explore sizes with our system size calculator and the on-grid solar calculator.

PM Surya Ghar, plus a special-category note

The national PM Surya Ghar: Muft Bijli Yojana pays 30,000 rupees per kW for the first 2 kW, adds 18,000 for the third kW, and caps at 78,000 rupees for 3 kW and above, up to 10 kW, paid by bank transfer after commissioning, with collateral-free loans near 7 percent. Tripura is a special-category North-East state, which may make it eligible for enhanced central assistance above the standard figures. This is not guaranteed, so please verify the current numbers on pmsuryaghar.gov.in before you count on extra help.

A quick worked example

Take a 3 kW system in Agartala. At about 4.2 units per kW per day it makes near 12.6 units a day, close to 378 units a month over the year. At around 6.5 rupees a unit that is roughly 2,450 rupees of value a month, near 29,000 rupees a year, before monsoon dips. After the 78,000 rupee subsidy the higher tariff means this pays back faster than in low-tariff regions. Check repayments on the solar loan EMI calculator and compare storage on the battery bank calculator.

Solar calculators for other Indian states & UTs

Pick your state or union territory for localized subsidy, tariff and net-metering figures — or open the full India states directory or the national India solar calculator.

Frequently asked questions

Who supplies electricity in Tripura?

The Tripura State Electricity Corporation Limited (TSECL) is the single state DISCOM. It manages connections, metering and rooftop net metering, and it is actively disbursing PM Surya Ghar subsidy to households that install solar.

Does the higher Tripura tariff make solar pay back faster?

Generally yes. With domestic rates running from about 5.25 up to 7.75 rupees per unit, each self-consumed solar unit is worth more than in low-tariff territories, so bill savings are larger and payback after the subsidy tends to be quicker.

Is there extra subsidy because Tripura is a special-category state?

Possibly. As a North-East state Tripura may be eligible for enhanced central assistance beyond the standard PM Surya Ghar amounts, but this is not guaranteed. Verify the current figures on pmsuryaghar.gov.in before relying on any additional top-up.

How much power will a 3 kW system make here?

At about 4.2 units per kW per day, a 3 kW array makes roughly 12 to 13 units a day, near 378 units a month averaged over the year. Monsoon months run lower, so plan around the annual figure rather than peak sunny days.

Sources & standards

Tripura's tariffs and its special-category subsidy status can change — verify current figures with these primary sources before relying on them.