Home / India / Bihar

Solar Calculator Bihar 2026

See panel size, PM Surya Ghar subsidy and monthly savings for your home under NBPDCL or SBPDCL.

Free · No email · No installer spam
4.2 unitsper kW of panels per day in Bihar (average of 3 cities)
4,583 unitsa year from a 3 kW system
Mar 5.1 · Jul 2.8best and weakest month, units per kW per day
30° facing southbest fixed panel angle in Patna
#16 of 36states and UTs ranked by solar output per kW

1 Your electricity

Enter your 6-digit PIN to auto-fill your district's average daily generation from NASA satellite data. You can always edit it below.

₹
₹/unit

Indian residential tariffs typically run ₹6–₹9 per unit and rise every year. Check a recent bill for your exact slab rate.

2 Cost & generation

₹/kW

A complete on-grid setup (panels, inverter, structure, wiring, installation) runs about ₹50,000–₹60,000 per kW in 2026. Tier-1 brands (Tata, Adani, Waaree) cost a little more.

units/kW/day

Most of India gets about 4 units (kWh) per kW per day on average; sunnier states (Rajasthan, Gujarat) can reach 4.5–5.

3 Subsidy & state top-up

Central subsidy: ₹30,000/kW up to 2 kW, +₹18,000 for the 3rd kW, capped at ₹78,000 for any system 3 kW and above (residential, up to 10 kW). As of May 2026 (per MNRE). Always confirm current rates at pmsuryaghar.gov.in before applying.

₹/kW

Some states add their own subsidy on top of the central one (e.g. Gujarat has offered ₹10,000/kW). Enter your state's per-kW top-up if any — leave 0 if unsure. Verify with your DISCOM.

4 How you'll pay

Your free-electricity date
—
— kW system · — panels
System cost (before subsidy)—
PM Surya Ghar subsidy—
State top-up—
Net cost to you—
Annual bill savings—
Payback period—
25-year savings—
— units/day Subsidy ₹—

Indicative estimates only. Subsidy rules and tariffs change by government notification and vary by state/DISCOM. Assumes a gradual annual tariff rise and panel degradation. Confirm current PM Surya Ghar rates and get installer quotes before purchasing.

Cumulative savings over 25 years
Starts negative (your net cost), crosses zero on your free-electricity date, then climbs into profit.
How PM Surya Ghar subsidy is calculated
Central subsidy slabs (residential, as of May 2026):
• Up to 2 kW: ₹30,000 per kW (1 kW = ₹30,000; 2 kW = ₹60,000)
• 3rd kW: +₹18,000 (so 3 kW = ₹78,000)
• 3 kW and above: capped at ₹78,000 (no extra above 3 kW; residential eligibility up to 10 kW)

Net cost = system cost − central subsidy − state top-up. Annual savings = annual units generated × tariff (capped at your usage). Payback = net cost ÷ annual savings; the free-electricity date is today plus the payback period. Source: Ministry of New & Renewable Energy / pmsuryaghar.gov.in — verify current values before applying.

Rooftop Solar in Bihar

Bihar is served by two state DISCOMs under the BSEB umbrella: NBPDCL covering the districts north of the Ganga and SBPDCL to the south, including Patna. Both follow BERC tariff orders and the same net-metering framework, so the rooftop process is consistent across the state.

Net metering and tariffs

BERC has waived application and meter-testing charges for residential rooftop systems under PM Surya Ghar, and in 2026 it approved the power-purchase and energy-accounting framework for a large 275 MW rooftop programme. Bihar carries one of the highest opening domestic slabs in the country, though the state government also cushions bills with tariff subsidy and, more recently, a free-units allowance for low consumption. For a solar owner the practical figure is the rate you avoid on the units your panels replace, often around Rs 7 per unit for a mid-sized home.

Sunshine and generation

The Gangetic plain sees decent sun, averaging near 4.2 units per kW per day, a little lower than the arid west because of summer haze and monsoon cloud. A 3 kW system generates roughly 4,600 units a year. Size yours against your bill with the system size calculator.

How PM Surya Ghar applies

The national scheme pays Rs 30,000 per kW for the first 2 kW and Rs 18,000 for the third, capped at Rs 78,000 for 3 kW and above, credited by DBT after commissioning. A collateral-free loan near 7 percent covers up to Rs 2 lakh, so model the instalments with the loan EMI calculator.

Worked example

Consider a 3 kW rooftop in Patna. At about 4.2 units per kW it produces close to 4,600 units annually. Offset at roughly Rs 7 per unit, that is near Rs 32,000 saved each year before export credit, and after the Rs 78,000 subsidy the net outlay is modest. Check the numbers with our on-grid calculator and estimate long-run returns using the savings calculator. If you also want backup during outages, size storage with the battery bank calculator.

Because Bihar bills, subsidies and free-unit rules change from year to year, treat these numbers as indicative and confirm the latest BERC order before ordering a system.

Solar generation in Bihar, month by month

From PVGIS 5.3 (European Commission Joint Research Centre), ERA5 solar data 2005-2023: a 1 kW grid-tied system at the best fixed angle with 14% system losses. Figures are the average of Patna, Gaya, Muzaffarpur. The calculator above uses 4.2 units per kW per day as its default.

Monthunits per kW per day3 kW system, units in the month
January4.7440
February5.1428
March5.1477
April4.9440
May4.3402
June3.5318
July2.8262
August3.0283
September3.4303
October4.2386
November4.6414
December4.6429

Solar output by city

Cityunits/kW/dayunits/kW/year3 kW, units/yearBest tilt
Gaya4.21,5334,59829°
Patna4.21,5304,59130°
Muzaffarpur4.21,5204,55931°

What each system size produces in Bihar

Systemunits per dayunits per monthunits per year
1 kW4.21271,528
2 kW8.42553,055
3 kW12.63824,583
5 kW20.96367,638
10 kW41.81,27315,275

How Bihar compares

Bihar ranks #16 of 36 states and union territories for output per kW: 1,528 units a year, 2% above the middle state (1,495). The range runs from 1,150 in Sikkim to 1,939 in Ladakh — see the full state ranking.

Solar calculators for nearby states & UTs

Compare subsidy, tariff and net-metering figures with the neighbouring states, or see all 36 in the India states directory and the national India solar calculator.

Frequently asked questions

Who approves rooftop solar net metering in Bihar?

NBPDCL north of the Ganga or SBPDCL to the south, both under BSEB and BERC rules; you apply through the national PM Surya Ghar portal.

Does Bihar add its own solar subsidy?

There is no separate per-kW state capital subsidy at present; residents rely on the central PM Surya Ghar amount of up to Rs 78,000 for 3 kW, though the state does subsidise general electricity tariffs.

How much power will a 1 kW system make in Bihar?

About 4.2 units a day on average, near 1,530 units a year, depending on season, dust and shading.

Are rooftop application charges waived in Bihar?

Yes, BERC has waived application and meter-testing charges for residential rooftop solar under PM Surya Ghar; installation and metering hardware costs still apply.

How much electricity does a 3 kW solar system generate in Bihar?

About 13 units a day or 4,583 units a year on average, from about 8.5 a day in July to 15.4 a day in March, according to PVGIS data for panels at the best fixed angle. Shading, dust and orientation change the result.

Learn more

Sources & standards

The subsidy amounts, net-metering rules and tariff figures used for Bihar come from these central and state sources.