Home / India / Chhattisgarh

Solar Calculator Chhattisgarh 2026

Estimate system size, cost and payback for your Chhattisgarh home with CSPDCL net metering and PM Surya Ghar subsidy built in.

Free · No email · No installer spam
4.1 unitsper kW of panels per day in Chhattisgarh (average of 3 cities)
4,438 unitsa year from a 3 kW system
Feb 5.1 · Jul 2.3best and weakest month, units per kW per day
27° facing southbest fixed panel angle in Raipur
#23 of 36states and UTs ranked by solar output per kW

1 Your electricity

Enter your 6-digit PIN to auto-fill your district's average daily generation from NASA satellite data. You can always edit it below.

₹
₹/unit

Indian residential tariffs typically run ₹6–₹9 per unit and rise every year. Check a recent bill for your exact slab rate.

2 Cost & generation

₹/kW

A complete on-grid setup (panels, inverter, structure, wiring, installation) runs about ₹50,000–₹60,000 per kW in 2026. Tier-1 brands (Tata, Adani, Waaree) cost a little more.

units/kW/day

Most of India gets about 4 units (kWh) per kW per day on average; sunnier states (Rajasthan, Gujarat) can reach 4.5–5.

3 Subsidy & state top-up

Central subsidy: ₹30,000/kW up to 2 kW, +₹18,000 for the 3rd kW, capped at ₹78,000 for any system 3 kW and above (residential, up to 10 kW). As of May 2026 (per MNRE). Always confirm current rates at pmsuryaghar.gov.in before applying.

₹/kW

Some states add their own subsidy on top of the central one (e.g. Gujarat has offered ₹10,000/kW). Enter your state's per-kW top-up if any — leave 0 if unsure. Verify with your DISCOM.

4 How you'll pay

Your free-electricity date
—
— kW system · — panels
System cost (before subsidy)—
PM Surya Ghar subsidy—
State top-up—
Net cost to you—
Annual bill savings—
Payback period—
25-year savings—
— units/day Subsidy ₹—

Indicative estimates only. Subsidy rules and tariffs change by government notification and vary by state/DISCOM. Assumes a gradual annual tariff rise and panel degradation. Confirm current PM Surya Ghar rates and get installer quotes before purchasing.

Cumulative savings over 25 years
Starts negative (your net cost), crosses zero on your free-electricity date, then climbs into profit.
How PM Surya Ghar subsidy is calculated
Central subsidy slabs (residential, as of May 2026):
• Up to 2 kW: ₹30,000 per kW (1 kW = ₹30,000; 2 kW = ₹60,000)
• 3rd kW: +₹18,000 (so 3 kW = ₹78,000)
• 3 kW and above: capped at ₹78,000 (no extra above 3 kW; residential eligibility up to 10 kW)

Net cost = system cost − central subsidy − state top-up. Annual savings = annual units generated × tariff (capped at your usage). Payback = net cost ÷ annual savings; the free-electricity date is today plus the payback period. Source: Ministry of New & Renewable Energy / pmsuryaghar.gov.in — verify current values before applying.

Rooftop solar in Chhattisgarh: CSPDCL, net metering and savings

Chhattisgarh distributes electricity through CSPDCL (Chhattisgarh State Power Distribution Company Limited), the DISCOM serving Raipur, Bilaspur, Durg and the wider state. Residential rooftop solar connects under CSERC net-metering regulations, with a bi-directional meter crediting the surplus units you export against the units you import from the grid.

Tariffs and savings

CSPDCL domestic tariffs rise by slab, from about ₹4.10 per unit at low usage to ₹4.30, ₹6.20 and ₹6.50 per unit higher up, with a variable cost adjustment added on top. We take around ₹6.3 per unit as a representative value for the power your panels replace. Units you self-consume avoid that full retail rate, so sizing to your own demand saves most; exported surplus is settled at a lower rate the commission sets. Model it with the on-grid solar calculator.

Plenty of sunshine

Central Chhattisgarh is genuinely sunny, with roughly 4.6 peak sun hours a day. Each 1 kW of panels then generates about 4.1 units daily, close to 1,500 units a year, and a 3 kW system makes near 4,500 units annually, among the better yields in eastern India. Size your array with the system size calculator.

PM Surya Ghar in Chhattisgarh

The PM Surya Ghar Muft Bijli Yojana pays ₹30,000 per kW for the first 2 kW, plus ₹18,000 for the 3rd kW, capped at ₹78,000 for 3 kW and above, for residential systems up to 10 kW, released by Direct Benefit Transfer after commissioning. Collateral-free loans near 7 percent cover the balance; check EMIs with the solar loan EMI calculator. Chhattisgarh has no confirmed separate per-kW capital subsidy for residential rooftop on top of the national scheme at present, so our state top-up is set to zero. Verify any current CREDA or state incentive with CSPDCL, as policy shifts.

Worked example

Consider a 3 kW system in Raipur generating about 4,500 units a year. At ₹6.3 per unit that offsets roughly ₹28,100 of grid power annually. With up to ₹78,000 back from PM Surya Ghar, a typical net cost after subsidy often pays back within a handful of years, after which the electricity is largely free for the working life of the panels. For homes wanting evening backup, weigh the added cost of storage with the battery bank calculator. Start at the India solar calculator and treat all numbers as indicative until confirmed with CSPDCL.

Solar generation in Chhattisgarh, month by month

From PVGIS 5.3 (European Commission Joint Research Centre), ERA5 solar data 2005-2023: a 1 kW grid-tied system at the best fixed angle with 14% system losses. Figures are the average of Raipur, Bilaspur, Jagdalpur. The calculator above uses 4.1 units per kW per day as its default.

Monthunits per kW per day3 kW system, units in the month
January5.0462
February5.1430
March4.9459
April4.7422
May4.2394
June3.2290
July2.3218
August2.5233
September3.2285
October4.2393
November4.6413
December4.7441

Solar output by city

Cityunits/kW/dayunits/kW/year3 kW, units/yearBest tilt
Bilaspur4.11,4984,49428°
Raipur4.11,4904,46927°
Jagdalpur4.01,4504,35126°

What each system size produces in Chhattisgarh

Systemunits per dayunits per monthunits per year
1 kW4.11231,479
2 kW8.12472,959
3 kW12.23704,438
5 kW20.36167,397
10 kW40.51,23314,794

How Chhattisgarh compares

Chhattisgarh ranks #23 of 36 states and union territories for output per kW: 1,479 units a year, 1% below the middle state (1,495). The range runs from 1,150 in Sikkim to 1,939 in Ladakh — see the full state ranking.

Solar calculators for nearby states & UTs

Compare subsidy, tariff and net-metering figures with the neighbouring states, or see all 36 in the India states directory and the national India solar calculator.

Frequently asked questions

Which DISCOM manages rooftop solar in Chhattisgarh?

CSPDCL (Chhattisgarh State Power Distribution Company Limited) is the state DISCOM. It handles net-metering applications, the bi-directional meter and grid connection for residential rooftop systems across Chhattisgarh.

What tariff is used for Chhattisgarh savings estimates?

CSPDCL domestic slabs run from about ₹4.10 per unit at low usage to ₹6.50 per unit higher up, plus a variable cost adjustment. We use around ₹6.3 per unit as a representative value for the grid power your solar displaces.

How much can a rooftop system generate in Chhattisgarh?

Chhattisgarh gets strong sunshine at roughly 4.6 peak sun hours a day, so a 1 kW system makes about 4.1 units daily and a 3 kW system near 4,500 units a year, among the better yields in eastern India.

Is there a state subsidy on top of PM Surya Ghar in Chhattisgarh?

PM Surya Ghar applies statewide with up to ₹78,000 for a 3 kW-plus system by DBT. There is no confirmed separate per-kW state capital subsidy for residential rooftop on top of it now, so the calculator keeps the top-up at zero. Confirm any live CREDA scheme with CSPDCL.

How much electricity does a 3 kW solar system generate in Chhattisgarh?

About 12 units a day or 4,438 units a year on average, from about 7.0 a day in July to 15.2 a day in February, according to PVGIS data for panels at the best fixed angle. Shading, dust and orientation change the result.

Learn more

Sources & standards