Home / India / Arunachal Pradesh

Solar Calculator Arunachal Pradesh 2026

Size a rooftop system for your Arunachal home using Department of Power net metering and the PM Surya Ghar subsidy, with battery backup for the hills.

Free · No email · No installer spam

1 Your electricity

Enter your 6-digit PIN to auto-fill your district's average daily generation from NASA satellite data. You can always edit it below.

₹/unit

Indian residential tariffs typically run ₹6–₹9 per unit and rise every year. Check a recent bill for your exact slab rate.

2 Cost & generation

₹/kW

A complete on-grid setup (panels, inverter, structure, wiring, installation) runs about ₹50,000–₹60,000 per kW in 2026. Tier-1 brands (Tata, Adani, Waaree) cost a little more.

units/kW/day

Most of India gets about 4 units (kWh) per kW per day on average; sunnier states (Rajasthan, Gujarat) can reach 4.5–5.

3 Subsidy & state top-up

Central subsidy: ₹30,000/kW up to 2 kW, +₹18,000 for the 3rd kW, capped at ₹78,000 for any system 3 kW and above (residential, up to 10 kW). As of May 2026 (per MNRE). Always confirm current rates at pmsuryaghar.gov.in before applying.

₹/kW

Some states add their own subsidy on top of the central one (e.g. Gujarat has offered ₹10,000/kW). Enter your state's per-kW top-up if any — leave 0 if unsure. Verify with your DISCOM.

4 How you'll pay

Your free-electricity date
— kW system · — panels
System cost (before subsidy)
PM Surya Ghar subsidy
State top-up
Net cost to you
Annual bill savings
Payback period
25-year savings
— units/day Subsidy ₹—

Indicative estimates only. Subsidy rules and tariffs change by government notification and vary by state/DISCOM. Assumes a gradual annual tariff rise and panel degradation. Confirm current PM Surya Ghar rates and get installer quotes before purchasing.

Cumulative savings over 25 years
Starts negative (your net cost), crosses zero on your free-electricity date, then climbs into profit.
How PM Surya Ghar subsidy is calculated
Central subsidy slabs (residential, as of May 2026):
• Up to 2 kW: ₹30,000 per kW (1 kW = ₹30,000; 2 kW = ₹60,000)
• 3rd kW: +₹18,000 (so 3 kW = ₹78,000)
• 3 kW and above: capped at ₹78,000 (no extra above 3 kW; residential eligibility up to 10 kW)

Net cost = system cost − central subsidy − state top-up. Annual savings = annual units generated × tariff (capped at your usage). Payback = net cost ÷ annual savings; the free-electricity date is today plus the payback period. Source: Ministry of New & Renewable Energy / pmsuryaghar.gov.in — verify current values before applying.

Rooftop solar in Arunachal Pradesh: the Department of Power and 2026 metering

Power across Arunachal Pradesh is supplied by the state Department of Power (DoP), which acts as the single utility for generation, transmission and distribution. Domestic supply leans heavily on hydro, so headline energy slabs are modest, but the state is spread across remote hill districts where lines are long and faults are common. That mix — reasonable tariffs but shaky reliability — is exactly where a rooftop system paired with a battery earns its keep.

Net metering and how you connect

Rooftop systems connect under the state net-metering framework aligned with national rooftop rules. Units your panels push to the grid are netted against units you draw, and you pay on the balance. Because DoP domestic slabs are telescopic, energy you use inside your own home during daylight is worth more than energy you export, so matching panel size to daytime load is the smart move.

Sunshine, terrain and grid reliability

Arunachal sits in the eastern Himalaya, with a long, cloudy south-west monsoon from roughly June to September and deep valleys that shade some sites. We use a conservative yield of about 3.8 units per kW per day as an annual average, already discounting the wet months. The real prize here is resilience: when the grid trips during storms, a solar-plus-battery setup keeps lights, phones and a fridge running. Model that with our off-grid solar calculator and battery runtime calculator.

How PM Surya Ghar applies

The national PM Surya Ghar: Muft Bijli Yojana pays 30,000 rupees per kW for the first 2 kW, adds 18,000 for the third kW, and caps at 78,000 rupees for systems of 3 kW and above (up to 10 kW residential), released as a bank transfer after commissioning, with collateral-free loans near 7 percent. Arunachal Pradesh is a PM Surya Ghar special-category North-East state, so enhanced central assistance may apply; treat that as unconfirmed and verify current terms on pmsuryaghar.gov.in before you budget. Compare set-ups on our on-grid solar calculator.

A quick worked example

Take a 3 kW system near Itanagar. At about 3.8 units per kW per day it makes roughly 11.4 units daily, near 340 units a month averaged over the year. Offsetting units worth about 5 rupees each, that is close to 1,700 rupees of monthly value before monsoon dips. After the 78,000 rupee subsidy, payback usually lands within a few years. Start from the India solar calculator or check returns on the solar savings calculator.

Solar calculators for other Indian states & UTs

Pick your state or union territory for localized subsidy, tariff and net-metering figures — or open the full India states directory or the national India solar calculator.

Frequently asked questions

Who supplies electricity in Arunachal Pradesh?

The state Department of Power (DoP) is the single utility handling generation, transmission and distribution. You apply through your local electrical division for a net-metered rooftop connection and claim the PM Surya Ghar subsidy on the self-owned CAPEX route.

Is a battery worth it in Arunachal Pradesh?

Often yes. Hill districts see frequent outages during storms and the long monsoon, so a battery lets your solar keep essential loads running when the grid is down. Size it with our battery bank and battery runtime calculators rather than guessing.

How much PM Surya Ghar subsidy will I get?

The confirmed national amount is 30,000 per kW up to 2 kW, plus 18,000 for the third kW, capped at 78,000 rupees for 3 kW and above, paid after commissioning. As a special-category North-East state, enhanced central help may apply, but verify current terms on pmsuryaghar.gov.in.

Does the cloudy monsoon hurt solar output here?

Yes, generation dips through the June to September rains and in shaded valleys, which is why we use a conservative full-year yield of about 3.8 units per kW per day. Judge the system on the annual average, not on a bright winter afternoon.

Sources & standards

Subsidy figures here follow the national rooftop scheme, while net-metering and connection rules are set by Arunachal Pradesh’s own power department and regulator — confirm current terms locally before you install.